Assignment 1 (of 2) 50% weighting for the grade.

Project Development

Build a project plan to a baseline that demonstrates a preferred business/value case for a project.  Use Gantt, Cashflow and Risk tools to illustrate the detail (templates for these tools are provided for you).

Present your work in a power point document (examples of what these might look like are provided to help you).

Include a final 1 or 2 slides that bullet point your reflective learning, based on the reading in the module and comparing this to your experience of developing a project plan.

Assignment 2 (of 2) 50% weighting for the grade.

Project Feasibility

Taking your assignment 1 baseline plan, analyse the project to test various feasibility options. 

Show how you have improved both the efficiency effectiveness, reduced risk and added value potential with those options.  As you did with assignment 1 Use Gantt, Cashflow and Risk tools to illustrate the detail (templates for these tools are provided for you).

Present your work in a power point document (examples of what these might look like are provided to help you).

Include a final 1 or 2 slides that bullet point your reflective learning, based on the reading in the module and comparing this to your experience of developing a project plan.

On page 4 and 5 is a checklist for minimum details you need to include, but we can review this in class.

Assignment One: Case study to Baseline plan (Create a power-point with these screenshots in)

  1. Project Case study start point, illustration & description (reveals the benefits being sought)
  2. Problem Definition Report
    1. A summary report word report (1 slide) along the lines of those in the slide format & the ‘project tools’ template
    2. Appendices of the detail of the problem definition:
      1. Screenshot with text box notes Risk (RAID);
      2. Screenshot with text box notes Cash-Flow;
      3. Screenshot with text box notes Gantt or Other schedule (i.e. calendar or xls version of Gantt)
  3. Baseline Project Definition Report
    1. A summary report word report (1 slide) along the lines of those in the slide format & the ‘project tools’ template
    2. Appendices of the detail of the project definition:
      1. Screenshot with text box notes Risk (RAID); updated with notes to highlight key concerns
      2. Screenshot with text box notes Cash-Flow; updated with notes to highlight key concerns
      3. Screenshot (each of the screens noted below) & add suitable text box notes Gantt;
        1. WBs build; Add tasks; Add duration estimates; Add logic between tasks within work packages; Add logic links between task across work packages; Format to Reveal critical path; Format to Reveal slack/float; Add resources (report on resource conflict); Fix a temporary Baseline (do this is the tracking Gantt view); Use smoothing (levelling within available slack), screenshot report; Use levelling then screenshot report, noting slip from baseline; Fix the resource conflict, show notes to explain how you did that. Screenshot the re-baselined Gantt.
    1. Reflective learning notes (1 or 2 slides)
    1. Reference list of reading (To Harvard)

Assignment Two: Beyond the Baseline plan (Create a power-point with these screenshots in)

  1. Baseline Project Definition Report (reworked/improved using feedback from assignment one)
    1. Project Report (Show an alternative project that might bring similar or more benefits to the previous baseline version)
      1. A summary report word report describing the change you are modelling (one slide) along the lines of those in the slide format & the ‘project tools’ template
      1. Appendices of the detail of the project change you are modelling:
        1. Screenshot with text box notes Risk (RAID); Show changes from Baseline
        1. Screenshot with text box notes Cash-Flow; Show changes from Baseline
        1. Screenshot with text box notes Gantt or Other schedule (i.e. calendar or xls version of Gantt) Show changes from Baseline as slippage
    1. Project Report(s) (Show an alternative project(s) that might bring similar or more benefits to the previous baseline version)
      1. Stakeholder and interests list/Map
      1. List of ideas
      1. Include the summary (1 slide)
      1. and appendices with notes (3 slides) Show changes from Baseline
    1. Project Report (Show a risk occurring, the impact and any contingency you need to put in place)
      1. Include the summary (1 slide)
      1. and appendices with notes (3 slides) Show changes from Baseline
    1. Reflective learning notes (1 or 2 slides)
    1. Reference list of reading (To Harvard)

All papers are written by ENL (US, UK, AUSTRALIA) writers with vast experience in the field. We perform a quality assessment on all orders before submitting them.

Do you have an urgent order?  We have more than enough writers who will ensure that your order is delivered on time. 

We provide plagiarism reports for all our custom written papers. All papers are written from scratch.

24/7 Customer Support

Contact us anytime, any day, via any means if you need any help. You can use the Live Chat, email, or our provided phone number anytime.

We will not disclose the nature of our services or any information you provide to a third party.

Assignment Help Services
Money-Back Guarantee

Get your money back if your paper is not delivered on time or if your instructions are not followed.

We Guarantee the Best Grades
Assignment Help Services