Problem Description

Consider that you are part of a team responsible for debottlenecking the process shown in Fig.1 to make it more energy-efficient. In the PFD, 9 streams have been highlighted (RED for hot streams and BLUE for cold streams. Hot streams are labelled H1 to H4 and cold streams are labelled C1 to C5 ). The information for the highlighted streams – mass flowrate, specific heat capacity, start and target temperature (i.e.: Ts and Tt) are given in Table 1. The minimum approach temperature for this process is 10oC .

        Table 1 Stream information (Ignore that the streams are not in mass balance)

Streamsm (kg/s)Cp (kJ/kgoC)Ts (oC)Tt (oC)
C1154.060170
C2352.035164
C3702.580125
C4802.5140300
C5502.0100300
H1504.016045
H2302.022060
H3254.032730
H4802.0220160

                                            Fig.1 Current Process Flow diagram

  • Provide an evaluation of the external utility cost (cooling water and steam) for the heat exchangers (HX1 to HX9) as shown in Fig 1
  • Illustrate a strategy for reducing external utility use in the process. This should be shown using the HEN grid.
  • Provide an evaluation of the external utility cost (cooling water and steam) for the modified process.

N/B:

  • Assume (and justify) appropriate inlet and outlet cooling temperature for each cooler
  • Assume (and justify) appropriate steam conditions for each heater
  • Assume cost of energy/type of fuel as appropriate for estimating utility costs
  • Provide detailed references for all data used in your calculation
  • Units must be shown explicitly in all your calculations, tables and figures and all assumptions must be fully justified.

Marking criteria

  Task  Marking criteria to achieve the maximum markMaximal achievable mark
  iPresentation – properly organised in sections, showing assumptions and justifications, clear descriptions and arguments to support each point, neatly labelled diagrams, units  15%
iiReferences – Harvard Style5%
iiiClear evaluation of external utility cost based on original PFD20%
   ivIllustration of strategy for reducing external utility use using HEN diagram including cascade diagram for pinch40%
viClear evaluation of the external utility cost based on your proposed integration20%

The mark distribution of the individual task has already been indicated above. The marking criteria shown below describe the required criteria to achieve a maximum mark for an individual task.  

All papers are written by ENL (US, UK, AUSTRALIA) writers with vast experience in the field. We perform a quality assessment on all orders before submitting them.

Do you have an urgent order?  We have more than enough writers who will ensure that your order is delivered on time. 

We provide plagiarism reports for all our custom written papers. All papers are written from scratch.

24/7 Customer Support

Contact us anytime, any day, via any means if you need any help. You can use the Live Chat, email, or our provided phone number anytime.

We will not disclose the nature of our services or any information you provide to a third party.

Assignment Help Services
Money-Back Guarantee

Get your money back if your paper is not delivered on time or if your instructions are not followed.

We Guarantee the Best Grades
Assignment Help Services