• Schedule Compression and Resource Leveling (100 points)
  • This assignment consists of 3 parts: questions about resourcing projects, schedule development and compression, and resource leveling. 
  • Part 1 Questions (20 points)
  • Provide responses to the following questions
  • 1.    What is the purpose of a staffing management plan?  What does it address?
  • 2.    Whom should the project manager consult when performing resource leveling?
  • 3.    Describe the two primary techniques for compressing a schedule?
  • 4.    When crashing a project schedule, describe the two criteria that are considered when considering which activities will be sped up.
  • Part 2 Project network/schedule -scheduling and compressing a schedule (30 points)
  • You’ve been asked to manage a project that includes conducting a two-week (10 working days) computer training class. Using the information in Table below, complete the following:
  • Activity
  • Immediate Predecessor
  • Normal Time (days)
  • Normal Cost
  • Crashed Time (days)
  • Crashed Cost
  • A – Obtain Instructor
  • None
  • 7
  • $500
  • 4
  • $800
  • B – Locate Room
  • A
  • 3
  • $200
  • 2
  • $350
  • C – Check Coats
  • None
  • 6
  • $500
  • 4
  • $900
  • D – Room Open?
  • C
  • 3
  • $200
  • 1
  • $500
  • E – Schedule Class
  • B and D
  • 2
  • $300
  • 1
  • $350
  • Prepare a network schedule showing:
  • Early Starts (ES) for all activities
  • Late Starts (LS) for all activities
  • Slacks for all activities
  • Critical path and its length
  • Non-critical paths and their length
  • Schedule Compression:
  • What is the crash cost per day for each activity?
  • Which activities should be crashed to meet a project deadline of 10 days with a minimum cost? You may assume that you can partially crash an activity.
  • What is the new cost after crashing the project?
  • Fully crash the project to its minimum duration.  Prepare a table that shows (for each day the project length is reduced) the project duration, the activities that are crashed, the incremental crash cost, and the total crash cost.
  • Part 3 Resource Leveling (40 points)
  • Using the data below
  • Activity ID
  • Activity
  • Immediate Predecessor
  • Duration in days
  • Resource
  • Work Hours per Day
  • A
  • Evaluate freezers
  • 2
  • Alcides
  • 6
  • B
  • Chart temperatures
  • 6
  • Joan
  • 4
  • C
  • Review service record
  • 2
  • Alcides
  • D
  • Consult with HVAC engineer
  • A, B, C
  • 3
  • Alcides
  • E
  • Develop construction plan
  • D
  • 10
  • Joan
  • F
  • Complete IC assignment
  • E
  • 2
  • Alcides
  • G
  • Complete ROI analysis
  • E
  • 5
  • Joan
  • H
  • Conduct regulatory review
  • E
  • 4
  • Joan
  • I
  • Obtain construction approval
  • F, G, H
  • 2
  • Alcides
  • a.    Create a project schedule in MS Excel ensuring that it reflects the predecessor/successor relationships identified in the table.
  • b.    How long will it take to complete the project?
  • c.    Joan and Alcides are not fully dedicated to the project.  Joan is only available for 4 hours each day, and Alcides is available for 6 hours per day.  The original estimated duration (in 8-hour days) results in over-allocation of Joan and Alcides.  Prepare a resource-leveled project schedule in MS Excel.  How long will it take to complete the project in a resource-leveled environment?

All papers are written by ENL (US, UK, AUSTRALIA) writers with vast experience in the field. We perform a quality assessment on all orders before submitting them.

Do you have an urgent order?  We have more than enough writers who will ensure that your order is delivered on time. 

We provide plagiarism reports for all our custom written papers. All papers are written from scratch.

24/7 Customer Support

Contact us anytime, any day, via any means if you need any help. You can use the Live Chat, email, or our provided phone number anytime.

We will not disclose the nature of our services or any information you provide to a third party.

Assignment Help Services
Money-Back Guarantee

Get your money back if your paper is not delivered on time or if your instructions are not followed.

We Guarantee the Best Grades
Assignment Help Services