Assignment Brief

Unit 5: LEGAL & STATUTORY RESPONSIBILITIES IN CONSTRUCTION                             Unit Tutor:

Assignment 2: Planning & Building Control

Issue Date:                                                            Submission Date:

Unit Learning Outcomes:

LO1: Examine the process used to obtain planning permission for the construction and alteration of buildings

LO2: Discuss the processes and regulations used to control design and to ensure safe buildings

Assignment Brief and Guidance:

Your client, CLD Developments Limited, is a newly formed property development company.  They have approached you, a planning and building control consultant, to advise on a potential development site.

Proposed Development 1 : Low rise residential

Sundridge Park Mansion, Willoughby Lane, Bromley, BR1 3FZ

Sundridge Park Mansion, Bromley, is a Grade 1 listed mansion house, built in 1796 by John Nash, set within Sundridge Golf Club. The client would like to convert this former hotel into 22 deluxe apartments, retaining all the original features. merit

You need to produce a professional client evaluation report on the planning and building control processes involved in this proposed development.  This report will enable the client to see if the proposed project is feasible.

The report should, also, contain the following:

  • Main legislation and agencies involved in the planning and building control processes
  • How planning and building control decisions are made and the process available for approval, appeal and monitoring
  • How planning system and agencies manage the development of land and building and the impact this has on the future development of an area.
  • Local planning and building control policy and plans
  • Mitigation advise for planning or building control issue
  • Impact planning and building control process will have on this project

Furthermore, the client has asked you to analyse how the Sundridge Park Development 1 would differ in terms of the planning and building control processes and information, from the proposed developments 2 & 3 below. Distinction

Proposed Development 2: Mid/ Medium Rise Residential

Imperial Street, Bromley-By-Bow, London, E3 3EA

This proposed sustainable development involves the demolition of an existing building and the development of 5 buildings ranging between 3-14 storeys in height for up to 407 residential units

Proposed Development 3: Commercial

Calverley Square, Tunbridge Wells, Kent

The proposed building of a new 1200 seat theatre in the centre of Calverley Gardens in Tunbridge Wells.

Submission Format:

The submission of the assignment should be in the form of a written evaluation report. The written work should be aimed at other construction professionals and company directors, so should contain relevant data and technical language.  Your choice of font face and font size should contribute to the clarity of the information. The report should be well structured, using headings, sub-headings and paragraphs as appropriate.  Any images, graphics or text derived from other resources must be correctly referenced using a standard form of citation. A bibliography should be included in a standard academic format.  The recommended word limit for this assignment is 3000-5000 words, but you will not be penalised for exceeding the total word limit.

The information in the table below shows the criteria which will be applied to your work when it is assessed:

  • In order to achieve a pass grade you must meet the pass criteria
  • To achieve a merit grade you must meet all the pass criteria and the merit criteria
  • To achieve a distinction grade you must meet all the pass, merit and distinction criteria.
PassMeritDistinction
LO1: Examine the process used to obtain planning permission for the construction and alteration of buildings LO2: Discuss the processes and regulations used to control design and to ensure safe buildings      D1 Evaluate the impact of planning systems and building regulation agencies in managing the development of land and buildings Comparing Sundridge park to one of the other two examples Impact changes in planning has on development of land – local plans/zoning Problems Changes to building regs and effect on building quality and sustainability  
P1 Explain the key legislation and agencies in the planning process Local planning authority – set local plan and design statement – consider planning applications against this Planning inspectorate – consider appeals from local planning authority Environment agency (flood risk) Conservation department or Heritage England (listed buildings/ conservation area) Permitted development Full application – objections Reject or grant Appeal – planning inspectorate    M1 Analyse the role of planning systems and agencies in managing the development of land and building Sundridge park example in brief
P2 Explain how planning decisions are made and processes available to appeal and monitor them Planning permission process and appeals process Planning app form
P3 Explain the key legislation and agencies in the building control process Building Regulations Building control officers – private and local authority  M2 Analyse the application of building regulations in low and medium rise residential and commercial buildings Analyse planning and building control process for Sundridge Park
P4 Discuss how building decisions are determined and the processes available to appeal and monitor them Building Reg full application Building notice

LSEC Bromley Campus

Assignment Submission Form

This Form should be detached from the assignment brief and attached to the work being submitted

Pearson BTEC Level 4 Higher National Certificate in Construction and the Built Environment

Unit 5: LEGAL & STATUTORY RESPONSIBILITIES IN CONSTRUCTION                                    Unit Tutor:

This section is to be completed by the student:
STUDENT NAME:                                                                                                                                               ID NUMBER:  
Assignment No: 2/3Title: Planning and Building Control
Issue Date:Submission Date:
Submitted on:
Learner declaration: I certify that the work in this assignment is my own work and that research sources are fully acknowledged.   Signature:                                                                                                                            Date:    
This section is to completed by the assessor
Learning outcomes covered by this assignment: LO1: Examine the process used to obtain planning permission for the construction and alteration of buildings LO2: Discuss the processes and regulations used to control design and to ensure safe buildings
Date received:
Assignment criteria for this assignment:Criteria met?
YesNoComment
LO1 P1   
LO1 P2   
LO2 P3   
LO2 P4   
LO1 M1   
LO2 M2   
LO1 LO2 D1   
Assessor feedback:                              
Assessor signature:                                                                                                               Date:  
Student actions:      
Student signature:                                                                                                                   Date:  

All papers are written by ENL (US, UK, AUSTRALIA) writers with vast experience in the field. We perform a quality assessment on all orders before submitting them.

Do you have an urgent order?  We have more than enough writers who will ensure that your order is delivered on time. 

We provide plagiarism reports for all our custom written papers. All papers are written from scratch.

24/7 Customer Support

Contact us anytime, any day, via any means if you need any help. You can use the Live Chat, email, or our provided phone number anytime.

We will not disclose the nature of our services or any information you provide to a third party.

Assignment Help Services
Money-Back Guarantee

Get your money back if your paper is not delivered on time or if your instructions are not followed.

We Guarantee the Best Grades
Assignment Help Services